Select the Gantt view like any other table view. Then set it up in its configuration window.
1.1 Select the Gantt view
In the table view options, select Gantt View.
1.2 Open Configure Gantt
In the view options bar, click Configure Gantt. The window has two tabs: Task and Project / Sub-tasks. The Edit relationships button sits at the top right.
2. How do I set up the Task tab?
The Task tab tells the Gantt which column to read for each bar. It sets the title, color, dates, progress and assignee.
#FieldDescription
1Task titleThe column shown as the task name.
2Task colorThe column that gives the bar its color (e.g. the color of the Status column).
3Task datesTwo choices: Start date and Duration, or Start date and End date. With an end date, the Gantt counts the days itself.
4Progress indicatorA Number column in decimal format, between 0 and 1 (0.8 = 80%). Details in chapter 2.1.
5Task userA Link to another table column that assigns the task to a user.
One source for the end of a task. With the Start date and Duration setting, the Gantt ignores the end date column of the table. Actions in the Gantt never update this date. A task can then start after its end in the table. Does your table have an end date? Choose the Start date and End date setting.
Once the columns are selected, the Task tab looks like this.
2.1 Which column works as the Progress indicator?
A task bar shows the value of the selected column, multiplied by 100. Enter a decimal number between 0 and 1: 0.8 gives 80%.
The bar shows 8000%? The value entered is 80 instead of 0.8. The Gantt always multiplies the value by 100.
Your Number column is missing from the list? Check its format. The Progress indicator list only offers Number columns in decimal format. An integer column does not appear.
Switch the column to decimal format to find it in the list. A formula column is not offered, even if it returns a decimal number.
1
Create a Number column in decimal format
Without the % symbol. It is the only column the Progress indicator accepts.
2
Enter progress from 0 to 1
0.5 gives 50% in the Gantt.
3
Write the rule in the column description
For example: enter 0 to 1, 0.5 = 50%.
The % format converts nothing. With this format, 0.5 shows as 0.50% in the table, but 50% in the Gantt.
2.2 How is a folder's progress calculated?
A folder or project bar calculates itself. It shows the average of its tasks, weighted by their number of days.
The day count includes the first and last day. Example: project EV01 has two tasks.
Task
Dates
Days
Progress
M02
15-12-2025 to 14-01-2026
31
80%
M01
28-10-2026 to 06-11-2026
10
0%
Project EV01
(80 × 31 + 0 × 10) ÷ 41 = 60.5
41
60%
A simple average would give 40%. A long task weighs more than a short one.
The weight of each task
Its number of days: calculated between the two dates, or read from the Duration column.
The duration of a folder
Recalculated from its tasks. A duration entered on the folder is ignored.
The duration of a project
From the first start to the last end of its tasks.
A 0-day task
A milestone, or a folder holding only a milestone, weighs nothing in the average.
Only fill in task progress. Folders and projects calculate themselves.
2.3 How do I create a milestone?
A milestone is a task without an end date. The Gantt shows it as a diamond, on its start date.
Fill in the start date, then leave the end date or the duration empty, depending on your setting. The tooltip shows Milestone and the start date.
A milestone counts 0 days. It weighs nothing in its folder progress.
3. How do I organize projects and sub-tasks?
The Project / Sub-tasks tab groups tasks under a parent. The Gantt then shows folders that open and close.
Intra-table link: a Link to another table column that points to its own table. It creates a parent → child, or task → sub-task, relationship.
3.1 The three Project / Sub-tasks options
Pick an option based on where your projects live: nowhere, in the same table, or in another table.
Option
What the Gantt shows
Column to select
1. No project
Tasks only. Tasks with sub-tasks stay visible and expand.
The parent task column (intra-table link), set to Unique link.
2. Use a 1st level parent task
Each row that holds tasks becomes a project. Its dates come from its child tasks.
An intra-table link, set to Unique link.
3. Use a link column as a project
Root projects come from another table. Their dates come from the child tasks.
A project column: a Link to another table column, set to Unique link.
The screenshots show the tab with the No project option, then with the Use a 1st level parent task option.
3.2 Is the project column list empty?
The Link to another table column is not set to Unique link. This is the cause with options 2 and 3 in chapter 3.1. The project column list then stays empty. Open the Link to another table column and check Unique link. The column then appears in the list.
3.3 Can a task be its own parent?
Yes: nothing prevents it. Row M01 can be selected as the parent of M01. The Gantt then files the task under itself.
A setting to know. Add a selection filter on the parent task column to exclude the row itself. Otherwise, check parent links after each entry.
3.4 Additional options
Three options lighten the display and the loading of large tables.
Date objectives column (optional)
Shows a red cursor at the target date. It is a date column from the project table, brought into the Gantt table by a linked table column.
Close all tasks on load
All tasks open closed. Then open the ones you need. Useful with many folders.
Mandatory filter
Requires a project choice in the selection filter. Only its folders appear. The Gantt loads faster on a large table.
3.5 Reading the Gantt view
The numbers on the screenshot match the items below.
#FieldDescription
1Project selection filterVisible when the Mandatory filter option is checked.
2Objective cursorVisible when a date objectives column is selected.
3Today cursorMarks today on the timeline.
4Project columnThe selected project.
5Parent tasks of the projectThe column of tasks attached to the project.
4. What does the Edit relationships button do?
The Edit relationships button sits at the top right of the configuration window. It opens the relationships table. Every dependency created in the Gantt is listed there.
1
Open the relationships table
Click Edit relationships in the Configure Gantt window.
2
Edit or add a relationship
Change the linked tasks, or create a new record with the + button.
3
Adjust the link point
Choose END or START for each end of the relationship.
Gantt Relations columns are added to your table. Using Edit relationships creates the Gantt Relations (Source Task / Target Task) columns. Hide them in your working views and forms.
Tip: automations can start from this table to simplify task management.
5. How do I work in the Gantt view?
Once configured, the Gantt works with the mouse: columns, scale, dependencies, moves and new tasks.
5.1 Show columns and open folders
1
Choose the columns
With the cursor, select the columns to show on the right.
2
Open or close folders
Folders follow your Project / Sub-tasks setting.
5.2 Change the chart scale
Select the chart scale: day, week or month.
A plan of a few months? Choose Month or Week. In Year view, a 10-day task becomes a thin line.
5.3 Create a dependency between tasks
Link a task to one or more others. Move the first one: the second follows, and its start date stays after the end of the first.
The shift also works from one project to another. The dates of the folders and projects concerned follow.
Dependency type
Effect
End to start
The next task starts as soon as the previous one ends.
Start to start
Both tasks start at the same time.
End to end
Both tasks end at the same time.
Start to end
The next task ends as soon as the first one starts.
An arrow links two child tasks, even across two projects. It can also point to a milestone.
Link
Result
A child task to another child task
Accepted, including across two projects.
A child task to a milestone
Accepted.
Two projects from a link column
Refused, with a message stating that adding a link on a project from a linked column is not allowed.
A parent folder to another parent folder
Refused.
A parent folder to a child task of another folder
Refused, both ways.
Chain two folders? Link the last task of the first folder to the first task of the second.
5.4 Edit a task with the mouse
A task bar can be edited directly in the Gantt, without opening the record. Each action is saved in the table.
Change progress
Hover over a child task: a small slider appears on the bar. Drag it right or left. The value is written to the progress column.
Lengthen or shorten
Drag the edge of the bar. A milestone cannot be lengthened.
Move a folder
Drag the parent folder: all its child tasks move with it.
What changes in the table
A move changes the start date. The slider writes a value between 0 and 1. An empty progress becomes 0 after a move.
Move several tasks
Hold Shift and click each task, then drag them.
5.5 Create a new task
1
Find the New Task button
The + button next to the task to link, or at the top of the table for a main task.
2
Click the button
The new task form opens.
3
Fill in the form
Enter the task details.
4
Save
The task appears in the Gantt.
5
Place the task
Adjust its position on the chart if needed.
6. Where can I watch the full video tutorial?
The tutorial covers this article. It is in French.
7. Go further
Go further
Link to another table
Column options, including Unique link and the selection filter.